Tawke Production Facility Upgrade
Project Information
DNO Middle East up gradation project to enable processing of 100, 00 BOPD Crude Oil with modest H2S and 5% water content. The project also includes future capability for processing 100 000 BPD Crude Oil with significant amount of water and a 15 000 BPD train for Crude Oil with high H2S content.
Pyramid E&C Scope
EP scope including
- Conceptual Engineering
- Detailed Engineering
- Procurement
Project Status
Operating