Concept to commissioning Engineering and Project management services
During the FEED phase, the project schedule, tendering philosophy, risk mitigation strategy, work break down structure and detailed cost estimates are developed to plan the procurement and construction phase. All of the process engineering is completed along with the mechanical engineering requirements necessary to proceed to the Detailed Engineering and Construction phase. The FEED deliverables include the following:
Final Heat and Material Balances (H&MB’s)
Equipment sizing, materials of construction and design temperatures and pressures.
Process control requirements, including any analyzers, programmable logic controllers, safety instrumented systems, etc.
Piping and Instrument Diagrams (P&ID’s)
Plot Plan
Process safety contingency analyses
Utility loads (e.g., steam, cooling water, waste water treating, etc.)
Interconnections with other units (onsite and offsite)
Pyramid E&C has a robust engineering team with track record of delivering more than 500 global assignments successfully. All the disciplines are in-house e.g.
Process Simulation
Basic engineering
PFD & P&ID Development
HAZOP & Safety Studies
Design of Process equipment
Plant hydraulics design
Specification for package systems
Instrument Specifications
Loss prevention system design
Operation & Maintenance Manual preparation
Commissioning & Troubleshooting
Static equipment e.g. distillation Columns, Vessels, Tanks, Heat exchangers and Reactors as per International codes & Practices (ASME , API, BS, EN, TEMA etc.)
Design by Finite Element analysis, Stress, Thermal analysis & Fatigue life evaluation
Specification of Pumps and Compressors
Specifications for Package bought outs
Technical and commercial bid analysis
Vendor Document Approvals
Factory acceptance test witness
Development of Plot Plans and Equipment layouts
Strength Calculations
Flexibility analysis
Plant 3-D Modeling and clash detection
Piping material Specification
Support specifications
Isometrics and Bill of Materials
Advanced dynamic analysis
Development of infrastructure and facilities
Subsurface related civil work
Foundation Design
Structural analysis
Structural design
Offshore Design of Platform top sides
Engineering of Skids and Modular Structures
Structural 3-D Modelling
Automated fabrication drawing and MTO generation
Electrical System Study
System reliability and stability study
Substation Design
Hazardous Area Classification
Load Calculation and System design
Specifications for Electrical Equipment
Calculation of Electrical Bulk materials
General Arrangement & Interface inputs
Development of Control Logic
Preparation of Cause & Effect diagrams
Safety studies
Specifications of controls system
DCS/PLC engineering
Preparation of Field Instrument specifications
Layout and 3D modelling of Instrument system
Mounting and hook up drawings
Communication Network Design
Study Facilitation (HAZOP,HAZID,ENVID,BOWTIE etc)
Active Fire Protection Design
Passive Fire Protection Design
Firewater System Design
Blowdown / Flare Studies
Fire & Gas Mapping
Site Hazard Assessment
Fire & Explosion Studies
QRA Studies
Risk Assessment Studies
TR Impairment Studies
EERA Studies
ESSA Studies
HSEIA Studies
ALARP Demonstration
Cost Benefit Analysis
Reliability Availability Maintainability (RAM)
Reliability Centered Maintenance (RCM)
Risk Based Inspection (RBI)
Safety Integrity Level (SIL) Assessments
Logistics & Transportation studies
Failure Modes Effects & Criticality Analysis (FMECA)
Life Cycle Costing
Baseline Environmental Studies
Environmental Risk Studies
Legislative Compliance Reviews
Preparation of Registers
Structural Analysis
Connection Design
Tekla/ SDS2 Modeling
Fabrication Drawings
PE Stamping
Project Management
Strength Calculations
Finite Element Analysis
Thermal Design
Shop AutoCAD Drawings
PE Stamping
RFI Support (from Houston)
General Arrangement
PDMS 3D Modelling
CAD Worx 3D Modelling
Isometric/ Spool Drawings
Stress Analysis
Site RFI Resolution
Electrical Studies
Cable/Tray Sizing
I&E Layout
Hook-up Drawings
PE Stamping
FAT Witness
This will close in 0 seconds